CTGR Qinghai Quingyu DC 100MW
Plant |
CTGR Qinghai Quingyu DC 100MW |
Location |
Golmud, Wutumeiren |
Capacity (MW) |
100MW |
Construction Start Date |
2023 |
Construction End Date |
Under construction |
Generation Start Year |
Plan: 2024 |
Solar Field Area (m²) |
711930 |
Receiver Midpoint Height (m) |
210 |
Receiver Fluid |
Molten Salt |
Receiever Manufacturer |
Cosin Solar (Supcon) |
Receiver Model |
Cosin Solar (Supcon) |
Number of Heliostats |
23731 |
General Plant Data
· Location: Golmud, Wutumeiren Haixi Qinghai China
· Capacity (MW): 100MW
Plant Timeline
· Construction Start Date: 2023
· Construction End Date: Under construction
· Generation Start Year: Plan: 2024
Plant Costs
Heliostat Design
· Solar Field Area (m²): 711930
Tower/Receiver
· Receiver Midpoint Height (m): 210
· Receiver Fluid: Molten Salt
· Receiever Manufacturer: Cosin Solar (Supcon)
· Receiver Model: Cosin Solar (Supcon)
Source: http://cnste.org/html/jiaodian/2023/1121/11744.html
Plant Layout
· Number of Heliostats: 23731
Other Sources:
[1] “CTGR
Qinghai Quingyu DC 100MW Tower + 900MW PV |
Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov,
solarpaces.nrel.gov/project/ctgr-qinghai-quingyu-dc-100mw-tower-900mw-pv.
Link: https://solarpaces.nrel.gov/project/ctgr-qinghai-quingyu-dc-100mw-tower-900mw-pv