Generation 3 Particle Pilot Plant Sandia
Plant |
Generation 3 Particle Pilot Plant Sandia |
Location |
Albuquerque, NM, U.S. |
Owner(s) |
Sandia National Laboratories |
Capacity (MW) |
1 |
Construction End Date |
Under Construction |
Generation Start Year |
2025 |
Construction Cost ($) |
$24 million |
Heliostat Manufacturer |
NSTTF,USA |
Heliostat Model |
NSTTF |
Mirror Manufacturer |
Bats, USA |
Tower Height (m) |
60 |
Receiver Fluid |
CO2 |
Receiever Manufacturer |
Sandia National Laboratories |
Receiver Model |
Prototype |
Number of Heliostats |
222 |
Tower Position (Lat/Long) |
34.962,-106.508333 |
General Plant Data
· Location: Albuquerque, NM, U.S.
· Owner(s): Sandia National Laboratories
· Capacity (MW): 1
Source: https://energy.sandia.gov/programs/renewable-energy/csp/current-research-projects/gen-3-particle-pilot-plant-g3p3/
Plant Timeline
· Construction End Date: Under Construction
· Generation Start Year: 2025
Plant Costs
· Construction Cost ($): $24 million
Heliostat Design
· Heliostat Manufacturer: NSTTF,USA
· Heliostat Model: NSTTF
· Mirror Manufacturer: Bats, USA
Tower/Receiver
· Tower Height (m): 60
· Receiver Fluid: CO2
· Receiever Manufacturer: Sandia National Laboratories
· Receiver Model: Prototype
Plant Layout
· Number of Heliostats: 222
· Tower Position (Lat/Long): 34.962,-106.508333
Other Sources:
[1]
“Generation 3 Particle Pilot Plant Sandia | Concentrating Solar Power Projects
| NREL.” Solarpaces.nrel.gov,
solarpaces.nrel.gov/project/generation-3-particle-pilot-plant-sandia.
Link: https://solarpaces.nrel.gov/project/generation-3-particle-pilot-plant-sandia