GENERATION PLANTS

 

 

Generation 3 Particle Pilot Plant Sandia

Plant

Generation 3 Particle Pilot Plant Sandia

Location

Albuquerque, NM, U.S.

Owner(s)

Sandia National Laboratories

Capacity (MW)

1

Construction End Date

Under Construction

Generation Start Year

2025

Construction Cost ($)

$24 million

Heliostat Manufacturer

NSTTF,USA

Heliostat Model

NSTTF

Mirror Manufacturer

Bats, USA

Tower Height (m)

60

Receiver Fluid

CO2

Receiever Manufacturer

Sandia National Laboratories

Receiver Model

Prototype

Number of Heliostats

222

Tower Position (Lat/Long)

34.962,-106.508333

General Plant Data

·         Location: Albuquerque, NM, U.S.

·         Owner(s): Sandia National Laboratories

·         Capacity (MW): 1

Graphical user interface, website

Description automatically generated

Source: https://energy.sandia.gov/programs/renewable-energy/csp/current-research-projects/gen-3-particle-pilot-plant-g3p3/

Plant Timeline

·         Construction End Date: Under Construction

·         Generation Start Year: 2025

Plant Costs

·         Construction Cost ($): $24 million

Heliostat Design

·         Heliostat Manufacturer: NSTTF,USA

·         Heliostat Model: NSTTF

·         Mirror Manufacturer: Bats, USA

Tower/Receiver

·         Tower Height (m): 60

·         Receiver Fluid: CO2

·         Receiever Manufacturer: Sandia National Laboratories

·         Receiver Model: Prototype

Plant Layout

·         Number of Heliostats: 222

·         Tower Position (Lat/Long): 34.962,-106.508333

 

 

Other Sources:

[1] “Generation 3 Particle Pilot Plant Sandia | Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov, solarpaces.nrel.gov/project/generation-3-particle-pilot-plant-sandia.

Link: https://solarpaces.nrel.gov/project/generation-3-particle-pilot-plant-sandia