Huidong New Energy Akesai 110MW

Plant

Huidong New Energy Akesai 110MW

Location

Aksai
Jiuquan
Gansu China

Capacity (MW)

110

Construction Start Date

2022

Construction End Date

Under construction

Generation Start Year

Plan: 2024

Heliostat Aperture Area (m²)

24

Heliostat Model

Stellio

Heliostat Facets (C x R)

Stellio

Solar Field Area (m²)

581068

Tower Height (m)

180.8

Receiver Fluid

Molten Salt

Number of Heliostats

23920

General Plant Data

·         Location: Aksai Jiuquan Gansu China

·         Capacity (MW): 110

Source: https://www.sohu.com/a/748999565_734062

Plant Timeline

·         Construction Start Date: 2022

·         Construction End Date: Under construction

·         Generation Start Year: Plan: 2024

Plant Costs

Heliostat Design

·         Heliostat Aperture Area (m²): 24

·         Heliostat Model: Stellio

·         Heliostat Facets (C x R): Stellio

·         Solar Field Area (m²): 581068

Source: https://www.sohu.com/a/713681001_120093798

Tower/Receiver

·         Tower Height (m): 180.8

·         Receiver Fluid: Molten Salt

Source: https://www.sohu.com/a/713681001_120093798#google_vignette

Plant Layout

·         Number of Heliostats: 23920

Source: http://en.cnste.org/html/csp/2023/0921/1608.html

 

Other Sources:

[1] “Huidong New Energy Akesai 110MW Tower+ 640MW PV | Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov, solarpaces.nrel.gov/project/huidong-new-energy-akesai-110mw-tower-640mw-pv.

Link: https://solarpaces.nrel.gov/project/huidong-new-energy-akesai-110mw-tower-640mw-pv

[2] “Solar Tower Construction of 110MW CSP Project in Akesai Completed - China Solar Thermal Alliance.” En.cnste.org, 21 Sept. 2023, en.cnste.org/html/csp/2023/0921/1608.html

Link: http://en.cnste.org/html/csp/2023/0921/1608.html