Huidong New Energy Akesai 110MW
Plant |
Huidong New Energy Akesai 110MW |
Location |
Aksai |
Capacity (MW) |
110 |
Construction Start Date |
2022 |
Construction End Date |
Under construction |
Generation Start Year |
Plan: 2024 |
Heliostat Aperture Area (m²) |
24 |
Heliostat Model |
Stellio |
Heliostat Facets (C x R) |
Stellio |
Solar Field Area (m²) |
581068 |
Tower Height (m) |
180.8 |
Receiver Fluid |
Molten Salt |
Number of Heliostats |
23920 |
General Plant Data
· Location: Aksai Jiuquan Gansu China
· Capacity (MW): 110
Source: https://www.sohu.com/a/748999565_734062
Plant Timeline
· Construction Start Date: 2022
· Construction End Date: Under construction
· Generation Start Year: Plan: 2024
Plant Costs
Heliostat Design
· Heliostat Aperture Area (m²): 24
· Heliostat Model: Stellio
· Heliostat Facets (C x R): Stellio
· Solar Field Area (m²): 581068
Source: https://www.sohu.com/a/713681001_120093798
Tower/Receiver
· Tower Height (m): 180.8
· Receiver Fluid: Molten Salt
Source: https://www.sohu.com/a/713681001_120093798#google_vignette
Plant Layout
· Number of Heliostats: 23920
Source: http://en.cnste.org/html/csp/2023/0921/1608.html
Other
Sources:
[1]
“Huidong New Energy Akesai 110MW Tower+ 640MW PV | Concentrating Solar Power
Projects | NREL.” Solarpaces.nrel.gov,
solarpaces.nrel.gov/project/huidong-new-energy-akesai-110mw-tower-640mw-pv.
Link: https://solarpaces.nrel.gov/project/huidong-new-energy-akesai-110mw-tower-640mw-pv
[2] “Solar
Tower Construction of 110MW CSP Project in Akesai Completed - China Solar
Thermal Alliance.” En.cnste.org, 21 Sept. 2023,
en.cnste.org/html/csp/2023/0921/1608.html
Link: http://en.cnste.org/html/csp/2023/0921/1608.html