Jemalong Solar Thermal Station

Location

Jemalong New South Wales Australia

Owner(s)

Vast Solar

Capacity (MW)

1.1 MW

Construction Start Date

2014

Construction End Date

Q2, 2015

Generation Start Year

2017

Construction Cost ($)

$21 mil

Specific Cost ($/kW)

14919.4

LCOE ($/kWh)

0.64

Heliostat Aperture Area (m²)

3.6m²

Heliostat Facets (C x R)

3x 1

Solar Field Area (m²)

15000

Tower Height (m)

30 m

Receiver Area (m²)

2.25m²

Receiver Fluid

Liquid Sodium

Receiever Manufacturer

Vast Solar

Number of Heliostats

3500

Tower Position (Lat/Long)

(-33.4,148.1)

General Plant Data

·         Location: Jemalong New South Wales Australia

·         Owner(s): Vast Solar

·         Capacity (MW): 1.1 MW

Source:  https://www.vast.energy/news/world-first-solar-methanol-plant-to-feed-off-port-augusta-solar-thermal-project

Plant Timeline

·         Construction Start Date: 2014

·         Construction End Date: Q2, 2015

·         Generation Start Year: 2017

Plant Costs

·         Construction Cost ($): $21 mil

·         Specific Cost ($/kW): 14919.4

·         LCOE ($/kWh): 0.64

Heliostat Design

·         Heliostat Aperture Area (m²): 3.6m²

·         Heliostat Facets (C x R): 3x 1

·         Solar Field Area (m²): 15000

·         Heliostat Cost pm² ($): 437.6

Source: https://www.vast.energy/past-projects

Tower/Receiver

·         Tower Height (m): 30 m

·         Receiver Area (m²): 2.25m²

·         Receiver Fluid: Liquid Sodium

·         Receiever Manufacturer: Vast Solar

Source: https://helioscsp.com/new-tank-design-promises-to-significantly-improve-the-reliability-concentrated-solar-power-of-thermal-energy-storage/

Plant Layout

·         Number of Heliostats: 3500

·         Tower Position (Lat/Long): (-33.4,148.1)

Source: https://www.vast.energy/news/world-first-solar-methanol-plant-to-feed-off-port-augusta-solar-thermal-project

Other Sources:

[1] “Jemalong Solar Thermal Station | Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov, solarpaces.nrel.gov/project/jemalong-solar-thermal-station.

Link: https://solarpaces.nrel.gov/project/jemalong-solar-thermal-station