Noor Energy 1 (DEWA IV) - Tower Segment
Plant |
Noor Energy 1 (DEWA IV) - Tower Segment |
Location |
Dubai, UAE |
Owner(s) |
Dubai Electricity & Water Authority |
Capacity (MW) |
100 |
Construction Start Date |
Dec.2018 |
Construction End Date |
Nov.22, 2021 |
Generation Start Year |
2022 |
LCOE ($/kWh) |
0.073/kWh |
Heliostat Manufacturer |
BrightSource Energy |
Heliostat Model |
LH2.5 heliostats |
Mirror Manufacturer |
AGC Glass Japan |
Mirror Model |
AGC SunMax Reflect |
Tower Height (m) |
260 |
Receiver Height (m) |
36 |
Receiver Fluid |
Molten Salt |
Receiever Manufacturer |
Cockerill Belgium, Shanghai Boiler Work |
Number of Heliostats |
70000 |
Tower Position (Lat/Long) |
(24.76,55.36) |
General Plant Data
· Location: Dubai, UAE
· Owner(s): Dubai Electricity & Water Authority
· Capacity (MW): 100
Source: http://www.cspfocus.cn/market/detail_4948.htm
Plant Timeline
· Construction Start Date: Dec.2018
· Construction End Date: Nov.22, 2021
· Generation Start Year: 2022
Plant Costs
· LCOE ($/kWh): 0.073/kWh
Heliostat Design
· Heliostat Manufacturer: BrightSource Energy
· Heliostat Model: LH2.5 heliostats
· Mirror Manufacturer: AGC Glass Japan
· Mirror Model: AGC SunMax Reflect
Source: https://helioscsp.com/dewa-inaugurates-noor-energy-1-visitors-centre-in-4th-phase-of-mohammed-bin-rashid-al-maktoum-solar-park/
Tower/Receiver
· Tower Height (m): 260
· Receiver Height (m): 36
· Receiver Fluid: Molten Salt
· Receiever Manufacturer: Cockerill Belgium, Shanghai Boiler Work
Source: https://noorenergy.ae/a-about/
Source: https://construsoftbimawards.com/solar-receiver-noor-energy-1-dewa-700mw-csp-and-250-mw-pv-hybrid-ipp-phase-iv/
Plant Layout
· Number of Heliostats: 70000
· Tower Position (Lat/Long): (24.76,55.36)
Source: Google Maps
Other
Sources:
[1] “Noor Energy 1 / DEWA IV
- 100MW Tower Segment | Concentrating Solar Power Projects | NREL.”
Solarpaces.nrel.gov,
solarpaces.nrel.gov/project/noor-energy-1-dewa-iv-100mw-tower-segment.
Link: https://solarpaces.nrel.gov/project/noor-energy-1-dewa-iv-100mw-tower-segment
[2] “Noor Energy – the
Largest Single-Site Concentrated Solar Power Plant in the World.” Noor Energy1,
noorenergy.ae/.
Link: https://noorenergy.ae/
[3] “Solar Receiver - Noor Energy 1 – DEWA 700MW CSP and 250 MW PV
Hybrid IPP Phase IV | BIM Awards.” Tekla BIM Awards 2024, 14 May 2020,
construsoftbimawards.com/solar-receiver-noor-energy-1-dewa-700mw-csp-and-250-mw-pv-hybrid-ipp-phase-iv/.