GENERATION PLANTS

 

 

Power China Toksun 100MW

Plant

Power China Toksun 100MW

Location

Toksun
Turpan
Xinjiang (XUAR) China

Capacity (MW)

100MW

Construction Start Date

2023

Construction End Date

Under Construction

Generation Start Year

Plan 2025

Heliostat Aperture Area (m²)

30

Heliostat Manufacturer

Cosin Solar

Heliostat Model

Cosin Solar

Solar Field Area (m²)

440400

Receiver Fluid

Molten Salt

Receiever Manufacturer

Cosin Solar

Receiver Model

Cosin Solar

Number of Heliostats

14680

Tower Position (Lat/Long)

42.749822,88.060567

General Plant Data

·         Location: Toksun Turpan Xinjiang (XUAR) China

·         Capacity (MW): 100MW

Plant Timeline

·         Construction Start Date: 2023

·         Construction End Date: Under Construction

·         Generation Start Year: Plan 2025

Plant Costs

Heliostat Design

·         Heliostat Aperture Area (m²): 30

·         Heliostat Manufacturer: Cosin Solar

·         Heliostat Model: Cosin Solar

·         Solar Field Area (m²): 440400

Tower/Receiver

·         Receiver Fluid: Molten Salt

·         Receiever Manufacturer: Cosin Solar

·         Receiver Model: Cosin Solar

Plant Layout

·         Number of Heliostats: 14680

·         Tower Position (Lat/Long): 42.749822,88.060567