Power China Ruoqiang 100MW

Plant

Power China Ruoqiang 100MW

Location

Ruoqiang
Bayingolin
Xinjiang (XUAR) China

Capacity (MW)

100

Construction Start Date

2022

Construction End Date

Underconstruction

Generation Start Year

Plan 2024

Construction Cost ($)

$200.15 million

Heliostat Aperture Area (m²)

48

Solar Field Area (m²)

600000

Receiver Fluid

Molten Salt

Number of Heliostats

12371

Tower Position (Lat/Long)

38.15, 90.11

General Plant Data

·         Location: Ruoqiang Bayingolin Xinjiang (XUAR) China

·         Capacity (MW): 100

Plant Timeline

·         Construction Start Date: 2022

·         Construction End Date: Underconstruction

·         Generation Start Year: Plan 2024

Plant Costs

·         Construction Cost ($): $200.15 million

Heliostat Design

·         Heliostat Aperture Area (m²): 48

·         Solar Field Area (m²): 600000

Tower/Receiver

·         Receiver Fluid: Molten Salt

Plant Layout

·         Number of Heliostats: 12371

·         Tower Position (Lat/Long): 38.15, 90.11