Power China Ruoqiang 100MW
Plant |
Power China Ruoqiang 100MW |
Location |
Ruoqiang |
Capacity (MW) |
100 |
Construction Start Date |
2022 |
Construction End Date |
Underconstruction |
Generation Start Year |
Plan 2024 |
Construction Cost ($) |
$200.15 million |
Heliostat Aperture Area (m²) |
48 |
Solar Field Area (m²) |
600000 |
Receiver Fluid |
Molten Salt |
Number of Heliostats |
12371 |
Tower Position (Lat/Long) |
38.15, 90.11 |
General Plant Data
· Location: Ruoqiang Bayingolin Xinjiang (XUAR) China
· Capacity (MW): 100
Plant Timeline
· Construction Start Date: 2022
· Construction End Date: Underconstruction
· Generation Start Year: Plan 2024
Plant Costs
· Construction Cost ($): $200.15 million
Heliostat Design
· Heliostat Aperture Area (m²): 48
· Solar Field Area (m²): 600000
Tower/Receiver
· Receiver Fluid: Molten Salt
Plant Layout
· Number of Heliostats: 12371
· Tower Position (Lat/Long): 38.15, 90.11