GENERATION PLANTS

 

 

SIDC Ruoqiang 100MW

Plant

SIDC Ruoqiang 100MW

Location

Ruoqiang
Bayingolin
Xinjiang (XUAR) China

Capacity (MW)

100MW

Construction Start Date

2023

Construction End Date

Under Construction

Generation Start Year

Plan 2025

Construction Cost ($)

251.3 million

LCOE ($)

12

Receiver Fluid

Molten Salt

General Plant Data

·         Location: Ruoqiang Bayingolin Xinjiang (XUAR) China

·         Capacity (MW): 100MW

Plant Timeline

·         Construction Start Date: 2023

·         Construction End Date: Under Construction

·         Generation Start Year: Plan 2025

Plant Costs

·         Construction Cost ($): 251.3 million

·         LCOE ($): 12

Heliostat Design

Tower/Receiver

·         Receiver Fluid: Molten Salt

Plant Layout