GENERATION PLANTS

 

 

SUPCON Delingha (10)

Plant

SUPCON Delingha (10)

Location

China

Owner(s)

SUPCON Solar

Capacity (MW)

10

Construction Start Date

2010

Generation Start Year

2013

Construction Cost ($)

150 mil

Cost pkWh ($)

2634.9

LCOE ($)

0.09

Heliostat Aperture Area (m²)

1.92

Heliostat Manufacturer

Supcon China

Heliostat Model

SUPCON

Mirror Manufacturer

Taiwan Glass Yueda Solar Mirror Co

Heliostat Dimension

1.6m x 1.2m

Heliostat Facets (C x R)

1x1

Solar Field Area (m²)

63000

Heliostat Cost pm² ($)

167.3

Tower Height (m)

80

Receiver Fluid

Water

Receiever Manufacturer

Hangzhou Boiler Group China

Receiver Model

External - Cylindrical

Number of Heliostats

22500

Tower Position (Lat/Long)

(37.366, 97.293)

General Plant Data

·       Location: China

·       Owner(s): SUPCON Solar

·       Capacity (MW): 10

Source: http://www.cosinsolar.com/cases/detail/id/9.html

Plant Timeline

·       Construction Start Date: 2010

·       Generation Start Year: 2013

Plant Costs

·       Construction Cost ($): 150 mil

·       Cost pkWh ($): 2634.9

·       LCOE ($): 0.09

Heliostat Design

·       Heliostat Aperture Area (m²): 1.92

·       Heliostat Manufacturer: Supcon China

·       Heliostat Model: SUPCON

·       Mirror Manufacturer: Taiwan Glass Yueda Solar Mirror Co

·       Heliostat Dimension: 1.6m x 1.2m

·       Heliostat Facets (C x R): 1x1

·       Solar Field Area (m²): 63000

·       Heliostat Cost pm² ($): 167.3

Source: http://www.cosinsolar.com/cases/detail/id/9.html

Tower/Receiver

·       Tower Height (m): 80

·       Receiver Fluid: Water

·       Receiever Manufacturer: Hangzhou Boiler Group China

·       Receiver Model: External - Cylindrical

Source: http://www.cnste.org/plus/view.php?aid=2823

Source: http://www.cosinsolar.com/cases/detail/id/9.html

Plant Layout

·       Number of Heliostats: 22500

·       Tower Position (Lat/Long): (37.366, 97.293)

Source: https://www.google.com/maps/search/37.366,97.293?sa=X&ved=2ahUKEwiHwpDIlvGBAxXnlGoFHSp2D0MQ8gF6BAgZEAA&ved=2ahUKEwiHwpDIlvGBAxXnlGoFHSp2D0MQ8gF6BAgaEAI

Local Environmental Conditions

The project located in the province of Qinghai in China, which has abundant solar radiation, but is a high altitude desert environment and the has severe weather conditions.

Lessons Learned

By the end of February 28, 2018, Delingha 10MW power station has been completing 86.7% of the designed power generation. From the statistical analysis, the main factors causing the power generation not fully reaching the capacity include equipment failure, extreme weather effects and operational differences, where the equipment failure is the most important factor. After fixing all the issues, the power generation reached 96.6% of the designed capacity during the 2018.[1]

From Mr. Jianxiang Jin, the biggest economic risk of concentrated solar power project is the power generation does not reach the designed value. Compared to trough-type heliostat power station, the tower-tupe have advantages of heat and light efficiency. SUPCON Solar has master the core technologies of tower type high-precision large-scale CSP. The deviation between the power generation of 10MW power station and the design value is less than 5%, which indicated the technology and equipment can be successfully put into operation and set a good foundation for the following 50MW and 100MW projects.[2]