Shouhang Dunhuang Phase II
Plant |
Shouhang Dunhuang Phase II |
Location |
China |
Owner(s) |
Shouhang |
Capacity (MW) |
100 |
Construction Start Date |
2016 |
Construction End Date |
2018 |
Generation Start Year |
2018 |
Construction Cost ($) |
3.04 bil |
Cost pkWh ($) |
4581.5 |
LCOE ($) |
0.08 |
Heliostat Aperture Area (m²) |
115.7 |
Heliostat Manufacturer |
Shouhang China |
Mirror Manufacturer |
Shanghai Yaohua Pikington Glass Group |
Mirror Model |
Super clear float glass |
Heliostat Dimension |
10.8m x 10.8m |
Heliostat Facets (C x R) |
7x5 |
Solar Field Area (m²) |
1400000 |
Heliostat Cost pm² ($) |
130.9 |
Tower Height (m) |
263 |
Receiver Fluid |
Molten Salt |
Receiever Manufacturer |
Shouhang China |
Receiver Model |
External - Cylindrical |
Number of Heliostats |
12121 |
Tower Position (Lat/Long) |
(40.062, 94.425) |
General Plant Data
· Location: China
· Owner(s): Shouhang
· Capacity (MW): 100
Source: https://helioscsp.com/china-shouhang-dunhuang-100-mw-molten-salt-solar-tower-concentrated-solar-power-plant-to-be-completed/
Plant Timeline
· Construction Start Date: 2016
· Construction End Date: 2018
· Generation Start Year: 2018
Plant Costs
· Construction Cost ($): 3.04 bil
· Cost pkWh ($): 4581.5
· LCOE ($): 0.08
Heliostat Design
· Heliostat Aperture Area (m²): 115.7
· Heliostat Manufacturer: Shouhang China
· Mirror Manufacturer: Shanghai Yaohua Pikington Glass Group
· Mirror Model: Super clear float glass
· Heliostat Dimension: 10.8m x 10.8m
· Heliostat Facets (C x R): 7x5
· Solar Field Area (m²): 1400000
· Heliostat Cost pm² ($): 130.9
Source: https://www.hbsinostar.com/news/exploring-the-super-mirror-power-station-dunh-42978873.html
Tower/Receiver
· Tower Height (m): 263
· Receiver Fluid: Molten Salt
· Receiever Manufacturer: Shouhang China
· Receiver Model: External - Cylindrical
Source: https://en.cspplaza.com/shouhang-dunhuang-100mw-towe-csp-plant-achieves-full-load-power-generation
Source: http://www.cnste.org/html/xiangmu/2020/0228/6071.html
Plant Layout
· Number of Heliostats: 12121
· Tower Position (Lat/Long): (40.062, 94.425)
Source: https://www.google.com/maps/@40.0650349,94.4223379,3488m/data=!3m1!1e3?hl=en&entry=ttu
Local Environmental Conditions
This project is located in Dunhuang, China. Dunhuang is located in Gobi desert, which has an average precipitation of 38.9mm, the annual average wind speed is 2m/s, and average annual dust days about 5~6 days. The average temperature during a year is about 9.4 degree Celsius and the DNI is about 1777 kWh/m².
Lessons Learned
To achieve the expected economic value and the investment
goals in a solar thermal power plant, it is essential to take on a leading role
in technology development.
In terms of design, the most significant challenge in solar thermal power plant
design lies in the design of the molten salt system.
In installation, careful planning of the construction sequence is the most
important part.
In the commissioning phase, it is important to place a strong emphasis on
system coordination and joint testing within the solar thermal system.
Source:
“首航节能敦煌100MW塔式光热电站建设和运维过程中的实践分享 -
CSPPLAZA光热发电网-太阳能热发电行业权威媒体商务平台!.” Cspplaza.com,
2019, www.cspplaza.com/article-15646-1.html. Accessed 23 Oct. 2023.