GENERATION PLANTS

 

 

ACME Solar Tower

Plant

ACME Solar Tower

Location

Bikaner Rajasthan India

Owner(s)

ACME Group

Capacity (MW)

2.5 MW

Construction Start Date

2009

Construction End Date

2011

Generation Start Year

2011

Heliostat Aperture Area (m²)

1.136

Heliostat Manufacturer

eSolar

Heliostat Facets (C x R)

1x1

Solar Field Area (m²)

16222

Tower Height (m)

46m

Receiver Fluid

Water

Number of Heliostats

14280

Tower Position (Lat/Long)

28.184, 73.241

General Plant Data

·         Location: Bikaner Rajasthan India

·         Owner(s): ACME Group

·         Capacity (MW): 2.5 MW

Source: https://guntherportfolio.com/2011/08/esolar-sierra-suntower-offline-again/

Plant Timeline

·         Construction Start Date: 2009

·         Construction End Date: 2011

·         Generation Start Year: 2011

Plant Costs

Heliostat Design

·         Heliostat Aperture Area (m²): 1.136

·         Heliostat Manufacturer: eSolar

·         Heliostat Facets (C x R): 1x1

·         Solar Field Area (m²): 16222

Source: https://www.solarpaces.org/worldwide-csp/csp-potential-solar-thermal-energy-by-country/india/

Tower/Receiver

·         Tower Height (m): 46m

·         Receiver Fluid: Water

Source: https://guntherportfolio.com/2011/08/esolar-sierra-suntower-offline-again/

Plant Layout

·         Number of Heliostats: 14280

·         Tower Position (Lat/Long): 28.184, 73.241

Other Sources:

[1] “ACME Solar Tower | Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov, solarpaces.nrel.gov/project/acme-solar-tower.

Link: https://solarpaces.nrel.gov/project/acme-solar-tower

[2] Bhushan, Chandra, Aruna Kumarankandath, and Nayanjyoti Goswami. "The state of concentrated solar power in India: a roadmap to developing solar thermal technologies in India." Centre for Science and Environment, New Delhi (2015).

Link: https://cdn.cseindia.org/userfiles/State%20of%20CSP%20in%20India%20low.pdf