ACME Solar Tower
Plant |
ACME Solar Tower |
Location |
Bikaner Rajasthan India |
Owner(s) |
ACME Group |
Capacity (MW) |
2.5 MW |
Construction Start Date |
2009 |
Construction End Date |
2011 |
Generation Start Year |
2011 |
Heliostat Aperture Area (m²) |
1.136 |
Heliostat Manufacturer |
eSolar |
Heliostat Facets (C x R) |
1x1 |
Solar Field Area (m²) |
16222 |
Tower Height (m) |
46m |
Receiver Fluid |
Water |
Number of Heliostats |
14280 |
Tower Position (Lat/Long) |
28.184, 73.241 |
General Plant Data
· Location: Bikaner Rajasthan India
· Owner(s): ACME Group
· Capacity (MW): 2.5 MW
Source: https://guntherportfolio.com/2011/08/esolar-sierra-suntower-offline-again/
Plant Timeline
· Construction Start Date: 2009
· Construction End Date: 2011
· Generation Start Year: 2011
Plant Costs
Heliostat Design
· Heliostat Aperture Area (m²): 1.136
· Heliostat Manufacturer: eSolar
· Heliostat Facets (C x R): 1x1
· Solar Field Area (m²): 16222
Source: https://www.solarpaces.org/worldwide-csp/csp-potential-solar-thermal-energy-by-country/india/
Tower/Receiver
· Tower Height (m): 46m
· Receiver Fluid: Water
Source: https://guntherportfolio.com/2011/08/esolar-sierra-suntower-offline-again/
Plant Layout
· Number of Heliostats: 14280
· Tower Position (Lat/Long): 28.184, 73.241
Other Sources:
[1] “ACME
Solar Tower | Concentrating Solar Power Projects | NREL.” Solarpaces.nrel.gov,
solarpaces.nrel.gov/project/acme-solar-tower.
Link: https://solarpaces.nrel.gov/project/acme-solar-tower
[2] Bhushan, Chandra, Aruna Kumarankandath, and Nayanjyoti
Goswami. "The state of concentrated solar power in India: a roadmap to developing
solar thermal technologies in India." Centre for Science and
Environment, New Delhi (2015).
Link: https://cdn.cseindia.org/userfiles/State%20of%20CSP%20in%20India%20low.pdf